Balçık Mh. Mustafa Kemal Cd. No:126
Monday-Saturday
Water Cooled Chimneys
Water Cooled Panels
Combustion Chambers
Upper Shell & Lower Shell
Water Cooled Elbows
Spare parts
Hood Skirt
Cooling Ring
Converter Cooling Moving Chimneys
Converter Cooling Fixed Chimneys
Converter and Steelworks Ladle Manufacturing
Spare parts
Boiler (Waste Heat Boilers)
Economizer & Module - Heaters
Superheater - Preheaters
Steam Dome
Feed Water Tank
Installation works of all parts specified in the Manufacturing Department in Iron and Steel Factories and ENERGY Plants
Pipeline Installation Works (Drain Lines - Air Lines - Water & Steam Circulation Lines - Installation Lines)
Providing certified personnel for installation, commissioning and maintenance and repair services of Power Plants and Iron and Steel Factories (Installer, Welder)
Partial pipe, panel, elbow and support replacement works on corroded and corroded Chimneys and Boilers (Waste Heat Boilers, Boilers, Steel Shop Converter Cooling Chimneys, Superheaters, Economizer etc.).
Coating Welding Applications that are resistant to high wear and corrosion areas, high temperature and abrasion in Boilers and Chimneys.
Welding and Assembly Revision Applications.
Exchange works of old Pipelines with new ones.
Piping Operations.
+90 262 751 544 Contact Us Today – We Answer Our Phones 24/7